CREATION OF THE BASE LAYER FOR A CONTAINER TERMINAL

Location:Mannheim, Germany
Execution:June 2022 to September 2022
Milling depth:25 cm to 35 cm
Factors of success:Extremely high load capacities with high loads due to reach stacks

CREATION OF THE BASE LAYER FOR A CONTAINER TERMINAL

Location:Heilbronn, Germany
Execution:March 2022 to June 2022
Milling depth:40 cm
Factors of success:Extremely high load capacities with high loads due to reach stacks

REHABILITATION OF FLOODGATE FOR HPA

Location:Hamburg, Germany
Execution:May-June 2020
Milling depth:100 cm
Factors of success:substitute of deep foundation, preparation of the statics including settlement calculation

CONSTRUCTION OF THE BASE COURSE IN THE HARBOUR AREA ROTTERDAM

Location:Rotterdam, Netherlands
Execution:July 2017
Milling depth:45 cm
Factors of success:

High load-bearing capacity, heavy traffic due to reach stackers

 

Rehabilitation of a dam crest for flood protection

Location:Zmajevac/Kopacevo, Croatia
Execution:November 2014
Milling depth:25 cm
Factors of success:

Permanently water-impermeable and secure, reduction of maintenance costs

 

Base course for a container terminal with high traffic loads

Location:Karlsruhe, Germany
Execution:February 2014
Milling depth:45 cm
Factors of success:

Extremely high load-bearing capacities, savings on rehabilitation costs

 

Construction of a fuel depot in the harbour area

Location:ColÃ_n, Panama
Execution:August 2012
Milling depth:40 cm
Factors of success:

Saving of bored piles thanks to the secure and permanent solidification of the native soil, shorter construction time

 