Location: |
Tannhausen, Germany |
Execution: |
October 2021 |
Milling depth: |
33 cm |
Factors of success: |
savings in time, durable high load-bearing capacity and stability |
Location: |
Weiglham, Germany |
Execution: |
October 2021 |
Milling depth: |
33 cm |
layer thickness: |
30 cm |
Factors of success: |
Pilot project for the recycling and immobilisation of road rubble containing PAHs in a HGT-in-situ with the binding agent NovoCrete ST 98 |
Location: |
Stödtlen, Germany |
Execution: |
September 2021 |
Milling depth: |
38 cm |
Factors of success: |
savings in time, greatly optimized carbon footprint through the realisation of a HGT-in-situ with NovoCrete ST 98 |
Location: |
Rottweil, Germany |
Execution: |
September 2021 |
Milling depth: |
35 cm |
Factors of success: |
use of dust reduced binding agent NovoCrete ST 98 due to downtown location |
Location: |
Geldern-Kevelaer, Germany |
Execution: |
August 2021 |
Milling depth: |
31 cm |
layer thickness: |
28 cm |
Factors of success: |
inhomogeneous substructure could be stabilised in a load-bearing manner, enormous savings in time and CO2 |
Location: |
Kirchheim Rieß, Germany |
Execution: |
September 2020 |
Milling depth: |
33 cm |
Factors of success: |
Rehabilitation was executed with upcoming material |
Location: |
Neustadt, Germany |
Execution: |
May-December 2020 (7 sections) |
Milling depth: |
40 cm |
Factors of success: |
Time savings, durable high load-bearing capacity and stability |
Location: |
Northern Marmara Highway 0-7, Turkey |
Execution: |
November 2019 |
Milling depth: |
40 cm |
Factors of success: |
Highway was built on backfill soil. Minimization of settlements due to the NovoCrete layer. |
Location: |
Stuttgart, Germany |
Execution: |
November 2019 |
Milling depth: |
35 cm |
Factors of success: |
No soil excavation, enormous time saving. |
Location: |
Rot am See, Germany |
Execution: |
October 2018 |
Milling depth: |
35 cm |
Factors of success: |
Widening in the course of the renovation |
Location: |
Hopfau-Glatt, Germany |
Execution: |
October 2017 |
Milling depth: |
45 cm |
Factors of success: |
Immobilization of contaminated material, savings of cost and time |
Location: |
Blaustein Weidach, Germany |
Execution: |
October 2016 |
Milling depth: |
40 cm |
Factors of success: |
No soil excavation, immobilization of contaminated material
|
|
|
Location: | Belgrade to Ni_, Serbia |
Execution: | May 2015 |
Milling depth: | 20 cm |
Factors of success: |
Saving of transportation time and costs, saving of material costs, lower impact on the environment
|
Location: | Cerezköy, Turkey |
Execution: | April 2015 |
Milling depth: | 30 cm |
Factors of success: | Time savings, secure and long-lasting results, environmentally friendly |
Location: | Merauke/Papua, Indonesia |
Execution: | September 2014 |
Milling depth: | 20 cm |
Factors of success: | Saving of time and costs, successful results despite difficult soil conditions and danger of flooding |
Location: |
Hüfingen, Germany |
Execution: |
October 2021 |
Milling |
30 cm |
Factors of success: |
100% recycling of the existing material |
Location: |
Seukendorf, Germany |
Execution: |
April 2021 |
Milling |
30 cm |
Factors of success: |
100% recycling of the existing material, no asphalt layers needed thanks to NovoDens surface protection |
Location: |
Geislingen, Germany |
Execution: |
April 2021 |
Milling |
20 cm |
Factors of success: |
The method of construction with NovoCrete is eligable to get financial support, therefore the HGT-in-situ could be realised using NovoCrete. |
Location: |
Mechernich, Germany |
Execution: |
December 2020 |
Milling |
20 cm |
Factors of success: |
The road is still in perfect condition even after heavy rainfalls |
Location: |
Freiensteinau, Germany |
Execution: |
December 2019 |
Milling |
35 cm |
Factors of success: |
Unstable soil was used for the base layer. |
Location: |
Frommenhausen, Germany |
Execution: |
December 2018 |
Milling |
30 cm |
Factors of success: |
Stabilization of unstable soil, Reuse of old asphalt |
Location: |
Laichingen, Germany |
Execution: |
May 2017 |
Milling |
30 cm |
Factors of success: |
Stabilization of unstable soil
|
Location: | Vestenbergsgreuth, Germany |
Execution: | October 2016 |
Milling depth: |
25 cm |
Factors of success: |
Natural visual appearance, no soil excavation
|
Location: | Hüfingen, Germany |
Execution: | Mai 2015 |
Milling depth: |
30 cm |
Factors of success: |
Rehabilitation oft he whole road within one day |
Location: | Schwieberdingen, Germany |
Execution: | October 2014 |
Milling depth: | 30 cm |
Factors of success: |
Secure, durable and environmentally friendly, saves costs
|
Location: | Bärenthal, Germany |
Execution: | September 2013 |
Milling depth: | 30 cm |
Factors of success: |
Time saving, permanently high load-bearing capacity and stability
|
Location: | Podberezje/Novgorod, Russia |
Execution: | October 2010 |
Milling depth: | 35–45 cm |
Factors of success: |
Frost resistance despite difficult soil conditions, road can be driven on without asphalt, cost saving
|
Location: |
Engstingen, Germany |
Execution: |
September 2021 |
Milling depth: |
30 cm |
Factors of success: |
Immobilization of the contamination in the existing gravel, solifidiaction of the existing track ballast and subsoil with NovoCrete® Rail as PSS |
Location: |
Grosselfingen, Germany |
Execution: |
July 2021 |
Milling depth: |
40 cm |
Factors of success: |
Durable rehabilitation of the sludge site, PSS was replaced by HGT in-situ with NovoCrete® Rail |
Location: |
Adana, Turkey |
Execution: |
Februar 2018 |
Milling depth: |
30 cm |
Factors of success: |
Short construction time, Stabilization of unstable ground |
Location: |
Sivas, Turkey |
Execution: |
September 2017 |
Milling depth: |
30 cm |
Factors of success: |
Short construction time, Stabilization of unstable ground |
Location: |
Samsun, Turkey |
Execution: | December 2016 |
Milling depth: | 30 cm |
Factors of success: | High savings of time and costs, Execution possible by sub-zero temperatures |
Location: | Denizli, Turkey |
Execution: | August 2014 |
Milling depth: | 30 cm |
Factors of success: |
High savings on transportation and material costs, short construction time and a high daily output
|
Location: | Michelbach, Germany |
Execution: | April 2014 |
Milling depth: | 45 cm |
Factors of success: |
High savings on transportation, material and landfill costs and reduced construction time
|
Location: | Stuttgart-Zuffenhausen, Germany |
Execution: | December 2011 |
Milling depth: | 40 cm |
Factors of success: |
No soil replacement necessary, savings on landfill charges and reduction in the asphalt layer
|
Location: |
Renningen, Germany |
Execution: |
October/November 2021 |
Milling depth: |
35 cm |
Factors of success: |
the whole rehabilitation including installation of asphalt could be executed on weekends only, this timeline could only be met by using NovoCrete. |
Location: |
Herrenzimmern, Germany |
Execution: |
October 2021 |
Milling depth: |
40 cm |
Factors of success: |
Immobilisation of contaminated material, scrapyard was originally built on a non bearing subsoil |
Location: |
Stuttgart, Germany |
Execution: |
July 2020 |
Milling depth: |
40 cm |
Factors of success: |
very high load-bearing capacity, savings in time and costs |
Location: |
Fichtenberg, Germany |
Execution: |
April 2019 |
Milling depth: |
40 cm |
Factors of success: |
Usage of the contaminated material on site |
Location: |
Stuttgart, Germany |
Execution: |
September 2019 |
Milling depth: |
40 cm |
Factors of success: |
NovoCrete layer was built with the official certificate of a water impermeable layer |
Location: |
Roth, Germany |
Execution: |
September 2018 |
Milling depth: |
40 cm |
Factors of success: |
Stabilization of unstable soil and ground |
Location: |
Ulm, Germany |
Execution: |
June 2017 |
Milling depth: |
50 cm |
Factors of success: |
Stabilization of unstable soil and ground
|
Location: |
Aldersbach, Germany |
Execution: |
April 2016 |
Milling depth: |
30 cm |
Factors of success: |
High savings of landfill costs, time savings
|
Location: |
Rottweil, Germany |
Execution: |
October 2015 |
Milling depth: |
35 cm |
Factors of success: |
Cost savings, pressure of time because of the day-to-day business
|
Location: | Stuttgart-Zuffenhausen, Germany |
Execution: | December 2014 |
Milling depth: | 35 cm |
Factors of success: |
High savings on time and costs, short construction time
|
Location: | Waghäusel, Germany |
Execution: | September 2014 |
Milling depth: | 35 cm |
Factors of success: |
High load-bearing capacity, secure and durable
|
Location: | Baruth, Germany |
Execution: | October 2011 |
Milling depth: | 35 cm |
Factors of success: |
High load-bearing capacity, secure and durable
|
Location: |
Haiming, Germany |
Execution: |
July 2021 |
Milling depth: |
30 cm |
Factors of success: |
Immobilisation of PFC contaminated soil |
Location: |
Metzingen, Germany |
Execution: |
February/March 2021 |
Milling depth: |
25-50 cm |
Factors of success: |
very high load-bearing capacity, savings in time and costs |
Location: |
Deißlingen-Lauffen, Germany |
Execution: |
September 2020 |
Milling depth: |
30 cm |
Factors of success: |
vey high load-bearing capacity, savings in time and costs |
Location: |
Balingen, Germany |
Execution: |
May 2019 |
Milling depth: |
200 cm |
Factors of success: |
Replacement of deep foundations, time and cost savings, slate rock could be consolidated frost-proof |
Location: |
Eichenberg, Germany |
Execution: |
November 2018 |
Milling depth: |
30 cm |
Factors of success: |
Water contamination liability insurance license due to NovoCrete® |
Location: |
Fellbach, Germany |
Execution: | May 2017 |
Milling depth: | 30–70 cm |
Factors of success: |
Stabilization of silty clay
|
Location: |
Eislingen, Germany |
Execution: |
June 2016 |
Milling depth: |
40 cm |
Factors of success: |
High savings of time and costs, no soil excavation
|
Location: | Herrenzimmern, Germany |
Execution: | October 2015 |
Milling depth: | 40 – 80 cm |
Factors of success: |
Company was able to move into the new building before winter, maximum of time saving
|
Location: | Markgröningen, Germany |
Execution: | April 2012 |
Milling depth: | 50–80 cm |
Factors of success: |
Very high load-bearing capacities, time and cost savings, conservation of resources
|
Location: | Stockach, Germany |
Execution: | November 2011 |
Milling depth: | 35 cm |
Factors of success: |
No soil replacement necessary, saving of construction time and costs
|
Location: | Minden, Germany |
Execution: | November 2010 |
Milling depth: | 40 cm |
Factors of success: |
Less transportation of soil and new materials to and from the site, high load-bearing capacity and frost resistance
|
Location: |
Hamburg, Germany |
Execution: |
May-June 2020 |
Milling depth: |
100 cm |
Factors of success: |
substitute of deep foundation, preparation of the statics including settlement calculation |
Location: | Rotterdam, Netherlands |
Execution: | July 2017 |
Milling depth: | 45 cm |
Factors of success: |
High load-bearing capacity, heavy traffic due to reach stackers
|
Location: | Zmajevac/Kopacevo, Croatia |
Execution: | November 2014 |
Milling depth: | 25 cm |
Factors of success: |
Permanently water-impermeable and secure, reduction of maintenance costs
|
Location: | Karlsruhe, Germany |
Execution: | February 2014 |
Milling depth: | 45 cm |
Factors of success: |
Extremely high load-bearing capacities, savings on rehabilitation costs
|
Location: | ColÃ_n, Panama |
Execution: | August 2012 |
Milling depth: | 40 cm |
Factors of success: |
Saving of bored piles thanks to the secure and permanent solidification of the native soil, shorter construction time
|
Location: |
Sindelfingen, Germany |
Execution: |
April 2021 |
Milling depth: |
40 cm |
Factor of success: |
Broadening of state road by using existing material |
Location: |
Dinkelsbühl, Germany |
Execution: |
June 2018 |
Milling depth: |
30 cm |
Factor of success: |
High bearing shoulder stabilization with material on site |
Location: | Lichtenstein, Germany |
Execution: |
June 2017 |
Milling depth: | 30 cm - 7 layers |
Factor of success: | Saving of time, costs and resources, e.g. landfill |
Location: | Nussdorf, Germany |
Execution: | May 2016 |
Milling depth: |
30 cm |
Factor of success: |
No maceration because of water impermeability
|
Location: | Croatia |
Execution: | July 2015 |
Milling depth: | 30 cm |
Factor of success: |
Permanent water impermeability, short construction period and sustainable success
|
Location: | Monterrey, Mexico |
Execution: | February 2014 |
Milling depth: | 20 cm |
Factor of success: | Better values compared with conventional rolled concrete |
Location: | Empfingen, Germany |
Execution: | February 2009 |
Milling depth: | None, structure 18 cm thick |
Factor of success: | No additional preservation work required, permanently secure and sustainable |
Location: | Bad Wildbad, Germany |
Execution: | June 2006 |
Milling depth: | 50 cm – 14 layers |
Factor of success: | Saving of time, costs and resources, e.g. landfill |
Here you can find all of our references listed in a PDF for download (latest update: September 30th 2022).
We have completed many other projects and would be happy to provide you with detailed information on our past successes. Please contact us to find out more.