Location: | Bad Zwischenhahn, Germany |
Execution: | October 2022 |
Milling depth: | 30 cm |
Factors of success: | Thin asphalt structure, packed layer up to 30 cm edge length, crushing with impact crusher, Bk 1.8 with 9 cm asphalt |
Location: | Tannhausen, Germany |
Execution: | October 2021 |
Milling depth: | 33 cm |
Factors of success: | savings in time, durable high load-bearing capacity and stability |
Location: | Weiglham, Germany |
Execution: | October 2021 |
Milling depth: | 33 cm |
layer thickness: | 30 cm |
Factors of success: | Pilot project for the recycling and immobilisation of road rubble containing PAHs in a HGT-in-situ with the binding agent NovoCrete ST 98 |
Location: | Stödtlen, Germany |
Execution: | September 2021 |
Milling depth: | 38 cm |
Factors of success: | savings in time, greatly optimized carbon footprint through the realisation of a HGT-in-situ with NovoCrete ST 98 |
Location: | Rottweil, Germany |
Execution: | September 2021 |
Milling depth: | 35 cm |
Factors of success: | use of dust reduced binding agent NovoCrete ST 98 due to downtown location |
Location: | Geldern-Kevelaer, Germany |
Execution: | August 2021 |
Milling depth: | 31 cm |
layer thickness: | 28 cm |
Factors of success: | inhomogeneous substructure could be stabilised in a load-bearing manner, enormous savings in time and CO2 |
Location: | Kirchheim Rieß, Germany |
Execution: | September 2020 |
Milling depth: | 33 cm |
Factors of success: | Rehabilitation was executed with upcoming material |
Location: | Neustadt, Germany |
Execution: | May-December 2020 (7 sections) |
Milling depth: | 40 cm |
Factors of success: | Time savings, durable high load-bearing capacity and stability |
Location: | Northern Marmara Highway 0-7, Turkey |
Execution: | November 2019 |
Milling depth: | 40 cm |
Factors of success: | Highway was built on backfill soil. Minimization of settlements due to the NovoCrete layer. |
Location: | Stuttgart, Germany |
Execution: | November 2019 |
Milling depth: | 35 cm |
Factors of success: | No soil excavation, enormous time saving. |
Location: | Rot am See, Germany |
Execution: | October 2018 |
Milling depth: | 35 cm |
Factors of success: | Widening in the course of the renovation Use of contaminated and cohesive soil |
Location: | Hopfau-Glatt, Germany |
Execution: | October 2017 |
Milling depth: | 45 cm |
Factors of success: | Immobilization of contaminated material, savings of cost and time |
Location: | Blaustein Weidach, Germany |
Execution: | October 2016 |
Milling depth: | 40 cm |
Factors of success: | No soil excavation, immobilization of contaminated material
|
|
Location: | Belgrade to Ni_, Serbia |
Execution: | May 2015 |
Milling depth: | 20 cm |
Factors of success: | Saving of transportation time and costs, saving of material costs, lower impact on the environment
|
Location: | Cerezköy, Turkey |
Execution: | April 2015 |
Milling depth: | 30 cm |
Factors of success: | Time savings, secure and long-lasting results, environmentally friendly |
Location: | Merauke/Papua, Indonesia |
Execution: | September 2014 |
Milling depth: | 20 cm |
Factors of success: | Saving of time and costs, successful results despite difficult soil conditions and danger of flooding |
Location: | Lichtenfels, Germany |
Execution: | August 2022 |
Milling depth: | 30 cm |
Factors of success: | High cost savings and short construction times |
Location: | Hüfingen, Germany |
Execution: | October 2021 |
Milling depth: | 30 cm |
Factors of success: | 100% recycling of the existing material |
Location: | Seukendorf, Germany |
Execution: | April 2021 |
Milling depth: | 30 cm |
Factors of success: | 100% recycling of the existing material, no asphalt layers needed thanks to NovoDens surface protection |
Location: | Geislingen, Germany |
Execution: | April 2021 |
Milling depth: | 20 cm |
Factors of success: | The method of construction with NovoCrete is eligable to get financial support, therefore the HGT-in-situ could be realised using NovoCrete. |
Location: | Mechernich, Germany |
Execution: | December 2020 |
Milling depth: | 20 cm |
Factors of success: | The road is still in perfect condition even after heavy rainfalls |
Location: | Freiensteinau, Germany |
Execution: | December 2019 |
Milling depth: | 35 cm |
Factors of success: | Unstable soil was used for the base layer. |
Location: | Frommenhausen, Germany |
Execution: | December 2018 |
Milling depth: | 30 cm |
Factors of success: | Stabilization of unstable soil, Reuse of old asphalt |
Location: | Laichingen, Germany |
Execution: | May 2017 |
Milling depth: | 30 cm |
Factors of success: | Stabilization of unstable soil
|
Location: | Vestenbergsgreuth, Germany |
Execution: | October 2016 |
Milling depth: | 25 cm |
Factors of success: | Natural visual appearance, no soil excavation
|
Location: | Hüfingen, Germany |
Execution: | Mai 2015 |
Milling depth: | 30 cm |
Factors of success: | Rehabilitation oft he whole road within one day |
Location: | Schwieberdingen, Germany |
Execution: | October 2014 |
Milling depth: | 30 cm |
Factors of success: | Secure, durable and environmentally friendly, saves costs
|
Location: | Bärenthal, Germany |
Execution: | September 2013 |
Milling depth: | 30 cm |
Factors of success: | Time saving, permanently high load-bearing capacity and stability
|
Location: | Podberezje/Novgorod, Russia |
Execution: | October 2010 |
Milling depth: | 35–45 cm |
Factors of success: | Frost resistance despite difficult soil conditions, road can be driven on without asphalt, cost saving
|
Location: | Sigmaringen, Germany |
Execution: | September 2022 |
Milling depth: | 40 cm |
Faktors of success: | High savings in transport and material costs as well as landfill fees, no PSS |
Location: | Engstingen, Germany |
Execution: | September 2021 |
Milling depth: | 30 cm |
Factors of success: | Immobilization of the contamination in the existing gravel, solifidiaction of the existing track ballast and subsoil with NovoCrete® Rail as PSS |
Location: | Grosselfingen, Germany |
Execution: | July 2021 |
Milling depth: | 40 cm |
Factors of success: | Durable rehabilitation of the sludge site, PSS was replaced by HGT in-situ with NovoCrete® Rail |
Location: | Adana, Turkey |
Execution: | Februar 2018 |
Milling depth: | 30 cm |
Factors of success: | Short construction time, Stabilization of unstable ground |
Location: | Sivas, Turkey |
Execution: | September 2017 |
Milling depth: | 30 cm |
Factors of success: | Short construction time, Stabilization of unstable ground |
Location: | Samsun, Turkey |
Execution: | December 2016 |
Milling depth: | 30 cm |
Factors of success: | High savings of time and costs, Execution possible by sub-zero temperatures |
Location: | Denizli, Turkey |
Execution: | August 2014 |
Milling depth: | 30 cm |
Factors of success: | High savings on transportation and material costs, short construction time and a high daily output
|
Location: | Michelbach, Germany |
Execution: | April 2014 |
Milling depth: | 45 cm |
Factors of success: | High savings on transportation, material and landfill costs and reduced construction time
|
Location: | Stuttgart-Zuffenhausen, Germany |
Execution: | December 2011 |
Milling depth: | 40 cm |
Factors of success: | No soil replacement necessary, savings on landfill charges and reduction in the asphalt layer
|
Location: | Butgenbach, Belgium |
Execution: | May 2022 |
Milling depth: | 40 cm |
Factors of success: | Very high load capacities, time and cost savings, very high loads from heavy goods traffic |
Location: | Himmelkron, Germany |
Execution: | July 2022 |
Milling depth: | 40 cm |
Factors of successs: | The complete refurbishment was completed on schedule in record time, with the least possible disruption to operations |
Location: | Metzingen, Germany |
Execution: | May 2022 |
Milling depth: | 35 cm |
Factors of success: | Very high load capacities, time and cost savings |
Location: | Renningen, Germany |
Execution: | October/November 2021 |
Milling depth: | 35 cm |
Factors of success: | the whole rehabilitation including installation of asphalt could be executed on weekends only, this timeline could only be met by using NovoCrete. |
Location: | Herrenzimmern, Germany |
Execution: | October 2021 |
Milling depth: | 40 cm |
Factors of success: | Immobilisation of contaminated material, scrapyard was originally built on a non bearing subsoil |
Location: | Stuttgart, Germany |
Execution: | July 2020 |
Milling depth: | 40 cm |
Factors of success: | very high load-bearing capacity, savings in time and costs |
Location: | Fichtenberg, Germany |
Execution: | April 2019 |
Milling depth: | 40 cm |
Factors of success: | Usage of the contaminated material on site |
Location: | Stuttgart, Germany |
Execution: | September 2019 |
Milling depth: | 40 cm |
Factors of success: | NovoCrete layer was built with the official certificate of a water impermeable layer |
Location: | Roth, Germany |
Execution: | September 2018 |
Milling depth: | 40 cm |
Factors of success: | Stabilization of unstable soil and ground |
Location: | Ulm, Germany |
Execution: | June 2017 |
Milling depth: | 50 cm |
Factors of success: | Stabilization of unstable soil and ground
|
Location: | Aldersbach, Germany |
Execution: | April 2016 |
Milling depth: | 30 cm |
Factors of success: | High savings of landfill costs, time savings
|
Location: | Rottweil, Germany |
Execution: | October 2015 |
Milling depth: | 35 cm |
Factors of success: | Cost savings, pressure of time because of the day-to-day business
|
Location: | Stuttgart-Zuffenhausen, Germany |
Execution: | December 2014 |
Milling depth: | 35 cm |
Factors of success: | High savings on time and costs, short construction time
|
Location: | Waghäusel, Germany |
Execution: | September 2014 |
Milling depth: | 35 cm |
Factors of success: | High load-bearing capacity, secure and durable
|
Location: | Baruth, Germany |
Execution: | October 2011 |
Milling depth: | 35 cm |
Factors of success: | High load-bearing capacity, secure and durable
|
Location: | Dormagen, Germany |
Execution: | May 2022 to February 2023 |
Milling depth: | 40 cm |
Factors of success: | The area was originally considered unsuitable for development due to contamination in the existing building, but the application under water law was approved through the conception and surface sealing with NovoCrete |
Location: | Haiming, Germany |
Execution: | July 2021 |
Milling depth: | 30 cm |
Factors of success: | Immobilisation of PFC contaminated soil |
Location: | Metzingen, Germany |
Execution: | February/March 2021 |
Milling depth: | 25-50 cm |
Factors of success: | very high load-bearing capacity, savings in time and costs |
Location: | Deißlingen-Lauffen, Germany |
Execution: | September 2020 |
Milling depth: | 30 cm |
Factors of success: | vey high load-bearing capacity, savings in time and costs |
Location: | Balingen, Germany |
Execution: | May 2019 |
Milling depth: | 200 cm |
Factors of success: | Replacement of deep foundations, time and cost savings, slate rock could be consolidated frost-proof |
Location: | Eichenberg, Germany |
Execution: | November 2018 |
Milling depth: | 30 cm |
Factors of success: | Water contamination liability insurance license due to NovoCrete® |
Location: | Fellbach, Germany |
Execution: | May 2017 |
Milling depth: | 30–70 cm |
Factors of success: | Stabilization of silty clay
|
Location: | Eislingen, Germany |
Execution: | June 2016 |
Milling depth: | 40 cm |
Factors of success: | High savings of time and costs, no soil excavation
|
Location: | Herrenzimmern, Germany |
Execution: | October 2015 |
Milling depth: | 40 – 80 cm |
Factors of success: | Company was able to move into the new building before winter, maximum of time saving
|
Location: | Markgröningen, Germany |
Execution: | April 2012 |
Milling depth: | 50–80 cm |
Factors of success: | Very high load-bearing capacities, time and cost savings, conservation of resources
|
Location: | Stockach, Germany |
Execution: | November 2011 |
Milling depth: | 35 cm |
Factors of success: | No soil replacement necessary, saving of construction time and costs
|
Location: | Minden, Germany |
Execution: | November 2010 |
Milling depth: | 40 cm |
Factors of success: | Less transportation of soil and new materials to and from the site, high load-bearing capacity and frost resistance
|
Location: | Mannheim, Germany |
Execution: | June 2022 to September 2022 |
Milling depth: | 25 cm to 35 cm |
Factors of success: | Extremely high load capacities with high loads due to reach stacks |
Location: | Heilbronn, Germany |
Execution: | March 2022 to June 2022 |
Milling depth: | 40 cm |
Factors of success: | Extremely high load capacities with high loads due to reach stacks |
Location: | Hamburg, Germany |
Execution: | May-June 2020 |
Milling depth: | 100 cm |
Factors of success: | substitute of deep foundation, preparation of the statics including settlement calculation |
Location: | Rotterdam, Netherlands |
Execution: | July 2017 |
Milling depth: | 45 cm |
Factors of success: | High load-bearing capacity, heavy traffic due to reach stackers
|
Location: | Zmajevac/Kopacevo, Croatia |
Execution: | November 2014 |
Milling depth: | 25 cm |
Factors of success: | Permanently water-impermeable and secure, reduction of maintenance costs
|
Location: | Karlsruhe, Germany |
Execution: | February 2014 |
Milling depth: | 45 cm |
Factors of success: | Extremely high load-bearing capacities, savings on rehabilitation costs
|
Location: | ColÃ_n, Panama |
Execution: | August 2012 |
Milling depth: | 40 cm |
Factors of success: | Saving of bored piles thanks to the secure and permanent solidification of the native soil, shorter construction time
|
Location: | Mommenheim-Schwabsburg, Germany |
Execution: | February 2022 |
Milling depth: | 30 cm |
Factors of success: | Contaminated verge material could be permanently consolidated on site |
Location: | Sindelfingen, Germany |
Execution: | April 2021 |
Milling depth: | 40 cm |
Factor of success: | Broadening of state road by using existing material |
Location: | Dinkelsbühl, Germany |
Execution: | June 2018 |
Milling depth: | 30 cm |
Factor of success: | High bearing shoulder stabilization with material on site |
Location: | Lichtenstein, Germany |
Execution: | June 2017 |
Milling depth: | 30 cm - 7 layers |
Factor of success: | Saving of time, costs and resources, e.g. landfill |
Location: | Nussdorf, Germany |
Execution: | May 2016 |
Milling depth: | 30 cm |
Factor of success: | No maceration because of water impermeability
|
Location: | Croatia |
Execution: | July 2015 |
Milling depth: | 30 cm |
Factor of success: | Permanent water impermeability, short construction period and sustainable success
|
Location: | Monterrey, Mexico |
Execution: | February 2014 |
Milling depth: | 20 cm |
Factor of success: | Better values compared with conventional rolled concrete |
Location: | Empfingen, Germany |
Execution: | February 2009 |
Milling depth: | None, structure 18 cm thick |
Factor of success: | No additional preservation work required, permanently secure and sustainable |
Location: | Bad Wildbad, Germany |
Execution: | June 2006 |
Milling depth: | 50 cm – 14 layers |
Factor of success: | Saving of time, costs and resources, e.g. landfill |
Here you can find all of our references listed in a PDF for download (latest update: March 31st 2023).
We have completed many other projects and would be happy to provide you with detailed information on our past successes. Please contact us to find out more.
Location: | Bad Zwischenhahn, Germany |
Execution: | October 2022 |
Milling depth: | 30 cm |
Factors of success: | Thin asphalt structure, packed layer up to 30 cm edge length, crushing with impact crusher, Bk 1.8 with 9 cm asphalt |
Location: | Tannhausen, Germany |
Execution: | October 2021 |
Milling depth: | 33 cm |
Factors of success: | savings in time, durable high load-bearing capacity and stability |
Location: | Weiglham, Germany |
Execution: | October 2021 |
Milling depth: | 33 cm |
layer thickness: | 30 cm |
Factors of success: | Pilot project for the recycling and immobilisation of road rubble containing PAHs in a HGT-in-situ with the binding agent NovoCrete ST 98 |
Location: | Stödtlen, Germany |
Execution: | September 2021 |
Milling depth: | 38 cm |
Factors of success: | savings in time, greatly optimized carbon footprint through the realisation of a HGT-in-situ with NovoCrete ST 98 |
Location: | Rottweil, Germany |
Execution: | September 2021 |
Milling depth: | 35 cm |
Factors of success: | use of dust reduced binding agent NovoCrete ST 98 due to downtown location |
Location: | Geldern-Kevelaer, Germany |
Execution: | August 2021 |
Milling depth: | 31 cm |
layer thickness: | 28 cm |
Factors of success: | inhomogeneous substructure could be stabilised in a load-bearing manner, enormous savings in time and CO2 |
Location: | Kirchheim Rieß, Germany |
Execution: | September 2020 |
Milling depth: | 33 cm |
Factors of success: | Rehabilitation was executed with upcoming material |
Location: | Neustadt, Germany |
Execution: | May-December 2020 (7 sections) |
Milling depth: | 40 cm |
Factors of success: | Time savings, durable high load-bearing capacity and stability |
Location: | Northern Marmara Highway 0-7, Turkey |
Execution: | November 2019 |
Milling depth: | 40 cm |
Factors of success: | Highway was built on backfill soil. Minimization of settlements due to the NovoCrete layer. |
Location: | Stuttgart, Germany |
Execution: | November 2019 |
Milling depth: | 35 cm |
Factors of success: | No soil excavation, enormous time saving. |
Location: | Rot am See, Germany |
Execution: | October 2018 |
Milling depth: | 35 cm |
Factors of success: | Widening in the course of the renovation Use of contaminated and cohesive soil |
Location: | Hopfau-Glatt, Germany |
Execution: | October 2017 |
Milling depth: | 45 cm |
Factors of success: | Immobilization of contaminated material, savings of cost and time |
Location: | Blaustein Weidach, Germany |
Execution: | October 2016 |
Milling depth: | 40 cm |
Factors of success: | No soil excavation, immobilization of contaminated material
|
|
Location: | Belgrade to Ni_, Serbia |
Execution: | May 2015 |
Milling depth: | 20 cm |
Factors of success: | Saving of transportation time and costs, saving of material costs, lower impact on the environment
|
Location: | Cerezköy, Turkey |
Execution: | April 2015 |
Milling depth: | 30 cm |
Factors of success: | Time savings, secure and long-lasting results, environmentally friendly |
Location: | Merauke/Papua, Indonesia |
Execution: | September 2014 |
Milling depth: | 20 cm |
Factors of success: | Saving of time and costs, successful results despite difficult soil conditions and danger of flooding |
Location: | Lichtenfels, Germany |
Execution: | August 2022 |
Milling depth: | 30 cm |
Factors of success: | High cost savings and short construction times |
Location: | Hüfingen, Germany |
Execution: | October 2021 |
Milling depth: | 30 cm |
Factors of success: | 100% recycling of the existing material |
Location: | Seukendorf, Germany |
Execution: | April 2021 |
Milling depth: | 30 cm |
Factors of success: | 100% recycling of the existing material, no asphalt layers needed thanks to NovoDens surface protection |
Location: | Geislingen, Germany |
Execution: | April 2021 |
Milling depth: | 20 cm |
Factors of success: | The method of construction with NovoCrete is eligable to get financial support, therefore the HGT-in-situ could be realised using NovoCrete. |
Location: | Mechernich, Germany |
Execution: | December 2020 |
Milling depth: | 20 cm |
Factors of success: | The road is still in perfect condition even after heavy rainfalls |
Location: | Freiensteinau, Germany |
Execution: | December 2019 |
Milling depth: | 35 cm |
Factors of success: | Unstable soil was used for the base layer. |
Location: | Frommenhausen, Germany |
Execution: | December 2018 |
Milling depth: | 30 cm |
Factors of success: | Stabilization of unstable soil, Reuse of old asphalt |
Location: | Laichingen, Germany |
Execution: | May 2017 |
Milling depth: | 30 cm |
Factors of success: | Stabilization of unstable soil
|
Location: | Vestenbergsgreuth, Germany |
Execution: | October 2016 |
Milling depth: | 25 cm |
Factors of success: | Natural visual appearance, no soil excavation
|
Location: | Hüfingen, Germany |
Execution: | Mai 2015 |
Milling depth: | 30 cm |
Factors of success: | Rehabilitation oft he whole road within one day |
Location: | Schwieberdingen, Germany |
Execution: | October 2014 |
Milling depth: | 30 cm |
Factors of success: | Secure, durable and environmentally friendly, saves costs
|
Location: | Bärenthal, Germany |
Execution: | September 2013 |
Milling depth: | 30 cm |
Factors of success: | Time saving, permanently high load-bearing capacity and stability
|
Location: | Podberezje/Novgorod, Russia |
Execution: | October 2010 |
Milling depth: | 35–45 cm |
Factors of success: | Frost resistance despite difficult soil conditions, road can be driven on without asphalt, cost saving
|
Location: | Sigmaringen, Germany |
Execution: | September 2022 |
Milling depth: | 40 cm |
Faktors of success: | High savings in transport and material costs as well as landfill fees, no PSS |
Location: | Engstingen, Germany |
Execution: | September 2021 |
Milling depth: | 30 cm |
Factors of success: | Immobilization of the contamination in the existing gravel, solifidiaction of the existing track ballast and subsoil with NovoCrete® Rail as PSS |
Location: | Grosselfingen, Germany |
Execution: | July 2021 |
Milling depth: | 40 cm |
Factors of success: | Durable rehabilitation of the sludge site, PSS was replaced by HGT in-situ with NovoCrete® Rail |
Location: | Adana, Turkey |
Execution: | Februar 2018 |
Milling depth: | 30 cm |
Factors of success: | Short construction time, Stabilization of unstable ground |
Location: | Sivas, Turkey |
Execution: | September 2017 |
Milling depth: | 30 cm |
Factors of success: | Short construction time, Stabilization of unstable ground |
Location: | Samsun, Turkey |
Execution: | December 2016 |
Milling depth: | 30 cm |
Factors of success: | High savings of time and costs, Execution possible by sub-zero temperatures |
Location: | Denizli, Turkey |
Execution: | August 2014 |
Milling depth: | 30 cm |
Factors of success: | High savings on transportation and material costs, short construction time and a high daily output
|
Location: | Michelbach, Germany |
Execution: | April 2014 |
Milling depth: | 45 cm |
Factors of success: | High savings on transportation, material and landfill costs and reduced construction time
|
Location: | Stuttgart-Zuffenhausen, Germany |
Execution: | December 2011 |
Milling depth: | 40 cm |
Factors of success: | No soil replacement necessary, savings on landfill charges and reduction in the asphalt layer
|
Location: | Butgenbach, Belgium |
Execution: | May 2022 |
Milling depth: | 40 cm |
Factors of success: | Very high load capacities, time and cost savings, very high loads from heavy goods traffic |
Location: | Himmelkron, Germany |
Execution: | July 2022 |
Milling depth: | 40 cm |
Factors of successs: | The complete refurbishment was completed on schedule in record time, with the least possible disruption to operations |
Location: | Metzingen, Germany |
Execution: | May 2022 |
Milling depth: | 35 cm |
Factors of success: | Very high load capacities, time and cost savings |
Location: | Renningen, Germany |
Execution: | October/November 2021 |
Milling depth: | 35 cm |
Factors of success: | the whole rehabilitation including installation of asphalt could be executed on weekends only, this timeline could only be met by using NovoCrete. |
Location: | Herrenzimmern, Germany |
Execution: | October 2021 |
Milling depth: | 40 cm |
Factors of success: | Immobilisation of contaminated material, scrapyard was originally built on a non bearing subsoil |
Location: | Stuttgart, Germany |
Execution: | July 2020 |
Milling depth: | 40 cm |
Factors of success: | very high load-bearing capacity, savings in time and costs |
Location: | Fichtenberg, Germany |
Execution: | April 2019 |
Milling depth: | 40 cm |
Factors of success: | Usage of the contaminated material on site |
Location: | Stuttgart, Germany |
Execution: | September 2019 |
Milling depth: | 40 cm |
Factors of success: | NovoCrete layer was built with the official certificate of a water impermeable layer |
Location: | Roth, Germany |
Execution: | September 2018 |
Milling depth: | 40 cm |
Factors of success: | Stabilization of unstable soil and ground |
Location: | Ulm, Germany |
Execution: | June 2017 |
Milling depth: | 50 cm |
Factors of success: | Stabilization of unstable soil and ground
|
Location: | Aldersbach, Germany |
Execution: | April 2016 |
Milling depth: | 30 cm |
Factors of success: | High savings of landfill costs, time savings
|
Location: | Rottweil, Germany |
Execution: | October 2015 |
Milling depth: | 35 cm |
Factors of success: | Cost savings, pressure of time because of the day-to-day business
|
Location: | Stuttgart-Zuffenhausen, Germany |
Execution: | December 2014 |
Milling depth: | 35 cm |
Factors of success: | High savings on time and costs, short construction time
|
Location: | Waghäusel, Germany |
Execution: | September 2014 |
Milling depth: | 35 cm |
Factors of success: | High load-bearing capacity, secure and durable
|
Location: | Baruth, Germany |
Execution: | October 2011 |
Milling depth: | 35 cm |
Factors of success: | High load-bearing capacity, secure and durable
|
Location: | Dormagen, Germany |
Execution: | May 2022 to February 2023 |
Milling depth: | 40 cm |
Factors of success: | The area was originally considered unsuitable for development due to contamination in the existing building, but the application under water law was approved through the conception and surface sealing with NovoCrete |
Location: | Haiming, Germany |
Execution: | July 2021 |
Milling depth: | 30 cm |
Factors of success: | Immobilisation of PFC contaminated soil |
Location: | Metzingen, Germany |
Execution: | February/March 2021 |
Milling depth: | 25-50 cm |
Factors of success: | very high load-bearing capacity, savings in time and costs |
Location: | Deißlingen-Lauffen, Germany |
Execution: | September 2020 |
Milling depth: | 30 cm |
Factors of success: | vey high load-bearing capacity, savings in time and costs |
Location: | Balingen, Germany |
Execution: | May 2019 |
Milling depth: | 200 cm |
Factors of success: | Replacement of deep foundations, time and cost savings, slate rock could be consolidated frost-proof |
Location: | Eichenberg, Germany |
Execution: | November 2018 |
Milling depth: | 30 cm |
Factors of success: | Water contamination liability insurance license due to NovoCrete® |
Location: | Fellbach, Germany |
Execution: | May 2017 |
Milling depth: | 30–70 cm |
Factors of success: | Stabilization of silty clay
|
Location: | Eislingen, Germany |
Execution: | June 2016 |
Milling depth: | 40 cm |
Factors of success: | High savings of time and costs, no soil excavation
|
Location: | Herrenzimmern, Germany |
Execution: | October 2015 |
Milling depth: | 40 – 80 cm |
Factors of success: | Company was able to move into the new building before winter, maximum of time saving
|
Location: | Markgröningen, Germany |
Execution: | April 2012 |
Milling depth: | 50–80 cm |
Factors of success: | Very high load-bearing capacities, time and cost savings, conservation of resources
|
Location: | Stockach, Germany |
Execution: | November 2011 |
Milling depth: | 35 cm |
Factors of success: | No soil replacement necessary, saving of construction time and costs
|
Location: | Minden, Germany |
Execution: | November 2010 |
Milling depth: | 40 cm |
Factors of success: | Less transportation of soil and new materials to and from the site, high load-bearing capacity and frost resistance
|
Location: | Mannheim, Germany |
Execution: | June 2022 to September 2022 |
Milling depth: | 25 cm to 35 cm |
Factors of success: | Extremely high load capacities with high loads due to reach stacks |
Location: | Heilbronn, Germany |
Execution: | March 2022 to June 2022 |
Milling depth: | 40 cm |
Factors of success: | Extremely high load capacities with high loads due to reach stacks |
Location: | Hamburg, Germany |
Execution: | May-June 2020 |
Milling depth: | 100 cm |
Factors of success: | substitute of deep foundation, preparation of the statics including settlement calculation |
Location: | Rotterdam, Netherlands |
Execution: | July 2017 |
Milling depth: | 45 cm |
Factors of success: | High load-bearing capacity, heavy traffic due to reach stackers
|
Location: | Zmajevac/Kopacevo, Croatia |
Execution: | November 2014 |
Milling depth: | 25 cm |
Factors of success: | Permanently water-impermeable and secure, reduction of maintenance costs
|
Location: | Karlsruhe, Germany |
Execution: | February 2014 |
Milling depth: | 45 cm |
Factors of success: | Extremely high load-bearing capacities, savings on rehabilitation costs
|
Location: | ColÃ_n, Panama |
Execution: | August 2012 |
Milling depth: | 40 cm |
Factors of success: | Saving of bored piles thanks to the secure and permanent solidification of the native soil, shorter construction time
|
Location: | Mommenheim-Schwabsburg, Germany |
Execution: | February 2022 |
Milling depth: | 30 cm |
Factors of success: | Contaminated verge material could be permanently consolidated on site |
Location: | Sindelfingen, Germany |
Execution: | April 2021 |
Milling depth: | 40 cm |
Factor of success: | Broadening of state road by using existing material |
Location: | Dinkelsbühl, Germany |
Execution: | June 2018 |
Milling depth: | 30 cm |
Factor of success: | High bearing shoulder stabilization with material on site |
Location: | Lichtenstein, Germany |
Execution: | June 2017 |
Milling depth: | 30 cm - 7 layers |
Factor of success: | Saving of time, costs and resources, e.g. landfill |
Location: | Nussdorf, Germany |
Execution: | May 2016 |
Milling depth: | 30 cm |
Factor of success: | No maceration because of water impermeability
|
Location: | Croatia |
Execution: | July 2015 |
Milling depth: | 30 cm |
Factor of success: | Permanent water impermeability, short construction period and sustainable success
|
Location: | Monterrey, Mexico |
Execution: | February 2014 |
Milling depth: | 20 cm |
Factor of success: | Better values compared with conventional rolled concrete |
Location: | Empfingen, Germany |
Execution: | February 2009 |
Milling depth: | None, structure 18 cm thick |
Factor of success: | No additional preservation work required, permanently secure and sustainable |
Location: | Bad Wildbad, Germany |
Execution: | June 2006 |
Milling depth: | 50 cm – 14 layers |
Factor of success: | Saving of time, costs and resources, e.g. landfill |
Here you can find all of our references listed in a PDF for download (latest update: March 31st 2023).
Wir verfügen über viele weitere Referenzen und detaillierte Projektinformationen - sprechen Sie uns bitte an.
Location: | Bad Zwischenhahn, Germany |
Execution: | October 2022 |
Milling depth: | 30 cm |
Factors of success: | Thin asphalt structure, packed layer up to 30 cm edge length, crushing with impact crusher, Bk 1.8 with 9 cm asphalt |
Location: | Tannhausen, Germany |
Execution: | October 2021 |
Milling depth: | 33 cm |
Factors of success: | savings in time, durable high load-bearing capacity and stability |
Location: | Weiglham, Germany |
Execution: | October 2021 |
Milling depth: | 33 cm |
layer thickness: | 30 cm |
Factors of success: | Pilot project for the recycling and immobilisation of road rubble containing PAHs in a HGT-in-situ with the binding agent NovoCrete ST 98 |
Location: | Stödtlen, Germany |
Execution: | September 2021 |
Milling depth: | 38 cm |
Factors of success: | savings in time, greatly optimized carbon footprint through the realisation of a HGT-in-situ with NovoCrete ST 98 |
Location: | Rottweil, Germany |
Execution: | September 2021 |
Milling depth: | 35 cm |
Factors of success: | use of dust reduced binding agent NovoCrete ST 98 due to downtown location |
Location: | Geldern-Kevelaer, Germany |
Execution: | August 2021 |
Milling depth: | 31 cm |
layer thickness: | 28 cm |
Factors of success: | inhomogeneous substructure could be stabilised in a load-bearing manner, enormous savings in time and CO2 |
Location: | Kirchheim Rieß, Germany |
Execution: | September 2020 |
Milling depth: | 33 cm |
Factors of success: | Rehabilitation was executed with upcoming material |
Location: | Neustadt, Germany |
Execution: | May-December 2020 (7 sections) |
Milling depth: | 40 cm |
Factors of success: | Time savings, durable high load-bearing capacity and stability |
Location: | Northern Marmara Highway 0-7, Turkey |
Execution: | November 2019 |
Milling depth: | 40 cm |
Factors of success: | Highway was built on backfill soil. Minimization of settlements due to the NovoCrete layer. |
Location: | Stuttgart, Germany |
Execution: | November 2019 |
Milling depth: | 35 cm |
Factors of success: | No soil excavation, enormous time saving. |
Location: | Rot am See, Germany |
Execution: | October 2018 |
Milling depth: | 35 cm |
Factors of success: | Widening in the course of the renovation Use of contaminated and cohesive soil |
Location: | Hopfau-Glatt, Germany |
Execution: | October 2017 |
Milling depth: | 45 cm |
Factors of success: | Immobilization of contaminated material, savings of cost and time |
Location: | Blaustein Weidach, Germany |
Execution: | October 2016 |
Milling depth: | 40 cm |
Factors of success: | No soil excavation, immobilization of contaminated material
|
|
Location: | Belgrade to Ni_, Serbia |
Execution: | May 2015 |
Milling depth: | 20 cm |
Factors of success: | Saving of transportation time and costs, saving of material costs, lower impact on the environment
|
Location: | Cerezköy, Turkey |
Execution: | April 2015 |
Milling depth: | 30 cm |
Factors of success: | Time savings, secure and long-lasting results, environmentally friendly |
Location: | Merauke/Papua, Indonesia |
Execution: | September 2014 |
Milling depth: | 20 cm |
Factors of success: | Saving of time and costs, successful results despite difficult soil conditions and danger of flooding |
Location: | Lichtenfels, Germany |
Execution: | August 2022 |
Milling depth: | 30 cm |
Factors of success: | High cost savings and short construction times |
Location: | Hüfingen, Germany |
Execution: | October 2021 |
Milling depth: | 30 cm |
Factors of success: | 100% recycling of the existing material |
Location: | Seukendorf, Germany |
Execution: | April 2021 |
Milling depth: | 30 cm |
Factors of success: | 100% recycling of the existing material, no asphalt layers needed thanks to NovoDens surface protection |
Location: | Geislingen, Germany |
Execution: | April 2021 |
Milling depth: | 20 cm |
Factors of success: | The method of construction with NovoCrete is eligable to get financial support, therefore the HGT-in-situ could be realised using NovoCrete. |
Location: | Mechernich, Germany |
Execution: | December 2020 |
Milling depth: | 20 cm |
Factors of success: | The road is still in perfect condition even after heavy rainfalls |
Location: | Freiensteinau, Germany |
Execution: | December 2019 |
Milling depth: | 35 cm |
Factors of success: | Unstable soil was used for the base layer. |
Location: | Frommenhausen, Germany |
Execution: | December 2018 |
Milling depth: | 30 cm |
Factors of success: | Stabilization of unstable soil, Reuse of old asphalt |
Location: | Laichingen, Germany |
Execution: | May 2017 |
Milling depth: | 30 cm |
Factors of success: | Stabilization of unstable soil
|
Location: | Vestenbergsgreuth, Germany |
Execution: | October 2016 |
Milling depth: | 25 cm |
Factors of success: | Natural visual appearance, no soil excavation
|
Location: | Hüfingen, Germany |
Execution: | Mai 2015 |
Milling depth: | 30 cm |
Factors of success: | Rehabilitation oft he whole road within one day |
Location: | Schwieberdingen, Germany |
Execution: | October 2014 |
Milling depth: | 30 cm |
Factors of success: | Secure, durable and environmentally friendly, saves costs
|
Location: | Bärenthal, Germany |
Execution: | September 2013 |
Milling depth: | 30 cm |
Factors of success: | Time saving, permanently high load-bearing capacity and stability
|
Location: | Podberezje/Novgorod, Russia |
Execution: | October 2010 |
Milling depth: | 35–45 cm |
Factors of success: | Frost resistance despite difficult soil conditions, road can be driven on without asphalt, cost saving
|
Location: | Sigmaringen, Germany |
Execution: | September 2022 |
Milling depth: | 40 cm |
Faktors of success: | High savings in transport and material costs as well as landfill fees, no PSS |
Location: | Engstingen, Germany |
Execution: | September 2021 |
Milling depth: | 30 cm |
Factors of success: | Immobilization of the contamination in the existing gravel, solifidiaction of the existing track ballast and subsoil with NovoCrete® Rail as PSS |
Location: | Grosselfingen, Germany |
Execution: | July 2021 |
Milling depth: | 40 cm |
Factors of success: | Durable rehabilitation of the sludge site, PSS was replaced by HGT in-situ with NovoCrete® Rail |
Location: | Adana, Turkey |
Execution: | Februar 2018 |
Milling depth: | 30 cm |
Factors of success: | Short construction time, Stabilization of unstable ground |
Location: | Sivas, Turkey |
Execution: | September 2017 |
Milling depth: | 30 cm |
Factors of success: | Short construction time, Stabilization of unstable ground |
Location: | Samsun, Turkey |
Execution: | December 2016 |
Milling depth: | 30 cm |
Factors of success: | High savings of time and costs, Execution possible by sub-zero temperatures |
Location: | Denizli, Turkey |
Execution: | August 2014 |
Milling depth: | 30 cm |
Factors of success: | High savings on transportation and material costs, short construction time and a high daily output
|
Location: | Michelbach, Germany |
Execution: | April 2014 |
Milling depth: | 45 cm |
Factors of success: | High savings on transportation, material and landfill costs and reduced construction time
|
Location: | Stuttgart-Zuffenhausen, Germany |
Execution: | December 2011 |
Milling depth: | 40 cm |
Factors of success: | No soil replacement necessary, savings on landfill charges and reduction in the asphalt layer
|
Location: | Butgenbach, Belgium |
Execution: | May 2022 |
Milling depth: | 40 cm |
Factors of success: | Very high load capacities, time and cost savings, very high loads from heavy goods traffic |
Location: | Himmelkron, Germany |
Execution: | July 2022 |
Milling depth: | 40 cm |
Factors of successs: | The complete refurbishment was completed on schedule in record time, with the least possible disruption to operations |
Location: | Metzingen, Germany |
Execution: | May 2022 |
Milling depth: | 35 cm |
Factors of success: | Very high load capacities, time and cost savings |
Location: | Renningen, Germany |
Execution: | October/November 2021 |
Milling depth: | 35 cm |
Factors of success: | the whole rehabilitation including installation of asphalt could be executed on weekends only, this timeline could only be met by using NovoCrete. |
Location: | Herrenzimmern, Germany |
Execution: | October 2021 |
Milling depth: | 40 cm |
Factors of success: | Immobilisation of contaminated material, scrapyard was originally built on a non bearing subsoil |
Location: | Stuttgart, Germany |
Execution: | July 2020 |
Milling depth: | 40 cm |
Factors of success: | very high load-bearing capacity, savings in time and costs |
Location: | Fichtenberg, Germany |
Execution: | April 2019 |
Milling depth: | 40 cm |
Factors of success: | Usage of the contaminated material on site |
Location: | Stuttgart, Germany |
Execution: | September 2019 |
Milling depth: | 40 cm |
Factors of success: | NovoCrete layer was built with the official certificate of a water impermeable layer |
Location: | Roth, Germany |
Execution: | September 2018 |
Milling depth: | 40 cm |
Factors of success: | Stabilization of unstable soil and ground |
Location: | Ulm, Germany |
Execution: | June 2017 |
Milling depth: | 50 cm |
Factors of success: | Stabilization of unstable soil and ground
|
Location: | Aldersbach, Germany |
Execution: | April 2016 |
Milling depth: | 30 cm |
Factors of success: | High savings of landfill costs, time savings
|
Location: | Rottweil, Germany |
Execution: | October 2015 |
Milling depth: | 35 cm |
Factors of success: | Cost savings, pressure of time because of the day-to-day business
|
Location: | Stuttgart-Zuffenhausen, Germany |
Execution: | December 2014 |
Milling depth: | 35 cm |
Factors of success: | High savings on time and costs, short construction time
|
Location: | Waghäusel, Germany |
Execution: | September 2014 |
Milling depth: | 35 cm |
Factors of success: | High load-bearing capacity, secure and durable
|
Location: | Baruth, Germany |
Execution: | October 2011 |
Milling depth: | 35 cm |
Factors of success: | High load-bearing capacity, secure and durable
|
Location: | Dormagen, Germany |
Execution: | May 2022 to February 2023 |
Milling depth: | 40 cm |
Factors of success: | The area was originally considered unsuitable for development due to contamination in the existing building, but the application under water law was approved through the conception and surface sealing with NovoCrete |
Location: | Haiming, Germany |
Execution: | July 2021 |
Milling depth: | 30 cm |
Factors of success: | Immobilisation of PFC contaminated soil |
Location: | Metzingen, Germany |
Execution: | February/March 2021 |
Milling depth: | 25-50 cm |
Factors of success: | very high load-bearing capacity, savings in time and costs |
Location: | Deißlingen-Lauffen, Germany |
Execution: | September 2020 |
Milling depth: | 30 cm |
Factors of success: | vey high load-bearing capacity, savings in time and costs |
Location: | Balingen, Germany |
Execution: | May 2019 |
Milling depth: | 200 cm |
Factors of success: | Replacement of deep foundations, time and cost savings, slate rock could be consolidated frost-proof |
Location: | Eichenberg, Germany |
Execution: | November 2018 |
Milling depth: | 30 cm |
Factors of success: | Water contamination liability insurance license due to NovoCrete® |
Location: | Fellbach, Germany |
Execution: | May 2017 |
Milling depth: | 30–70 cm |
Factors of success: | Stabilization of silty clay
|
Location: | Eislingen, Germany |
Execution: | June 2016 |
Milling depth: | 40 cm |
Factors of success: | High savings of time and costs, no soil excavation
|
Location: | Herrenzimmern, Germany |
Execution: | October 2015 |
Milling depth: | 40 – 80 cm |
Factors of success: | Company was able to move into the new building before winter, maximum of time saving
|
Location: | Markgröningen, Germany |
Execution: | April 2012 |
Milling depth: | 50–80 cm |
Factors of success: | Very high load-bearing capacities, time and cost savings, conservation of resources
|
Location: | Stockach, Germany |
Execution: | November 2011 |
Milling depth: | 35 cm |
Factors of success: | No soil replacement necessary, saving of construction time and costs
|
Location: | Minden, Germany |
Execution: | November 2010 |
Milling depth: | 40 cm |
Factors of success: | Less transportation of soil and new materials to and from the site, high load-bearing capacity and frost resistance
|
Location: | Mannheim, Germany |
Execution: | June 2022 to September 2022 |
Milling depth: | 25 cm to 35 cm |
Factors of success: | Extremely high load capacities with high loads due to reach stacks |
Location: | Heilbronn, Germany |
Execution: | March 2022 to June 2022 |
Milling depth: | 40 cm |
Factors of success: | Extremely high load capacities with high loads due to reach stacks |
Location: | Hamburg, Germany |
Execution: | May-June 2020 |
Milling depth: | 100 cm |
Factors of success: | substitute of deep foundation, preparation of the statics including settlement calculation |
Location: | Rotterdam, Netherlands |
Execution: | July 2017 |
Milling depth: | 45 cm |
Factors of success: | High load-bearing capacity, heavy traffic due to reach stackers
|
Location: | Zmajevac/Kopacevo, Croatia |
Execution: | November 2014 |
Milling depth: | 25 cm |
Factors of success: | Permanently water-impermeable and secure, reduction of maintenance costs
|
Location: | Karlsruhe, Germany |
Execution: | February 2014 |
Milling depth: | 45 cm |
Factors of success: | Extremely high load-bearing capacities, savings on rehabilitation costs
|
Location: | ColÃ_n, Panama |
Execution: | August 2012 |
Milling depth: | 40 cm |
Factors of success: | Saving of bored piles thanks to the secure and permanent solidification of the native soil, shorter construction time
|
Location: | Mommenheim-Schwabsburg, Germany |
Execution: | February 2022 |
Milling depth: | 30 cm |
Factors of success: | Contaminated verge material could be permanently consolidated on site |
Location: | Sindelfingen, Germany |
Execution: | April 2021 |
Milling depth: | 40 cm |
Factor of success: | Broadening of state road by using existing material |
Location: | Dinkelsbühl, Germany |
Execution: | June 2018 |
Milling depth: | 30 cm |
Factor of success: | High bearing shoulder stabilization with material on site |
Location: | Lichtenstein, Germany |
Execution: | June 2017 |
Milling depth: | 30 cm - 7 layers |
Factor of success: | Saving of time, costs and resources, e.g. landfill |
Location: | Nussdorf, Germany |
Execution: | May 2016 |
Milling depth: | 30 cm |
Factor of success: | No maceration because of water impermeability
|
Location: | Croatia |
Execution: | July 2015 |
Milling depth: | 30 cm |
Factor of success: | Permanent water impermeability, short construction period and sustainable success
|
Location: | Monterrey, Mexico |
Execution: | February 2014 |
Milling depth: | 20 cm |
Factor of success: | Better values compared with conventional rolled concrete |
Location: | Empfingen, Germany |
Execution: | February 2009 |
Milling depth: | None, structure 18 cm thick |
Factor of success: | No additional preservation work required, permanently secure and sustainable |
Location: | Bad Wildbad, Germany |
Execution: | June 2006 |
Milling depth: | 50 cm – 14 layers |
Factor of success: | Saving of time, costs and resources, e.g. landfill |