Location: | Dormagen, Germany |
Execution: | May 2022 to February 2023 |
Milling depth: | 40 cm |
Factors of success: | The area was originally considered unsuitable for development due to contamination in the existing building, but the application under water law was approved through the conception and surface sealing with NovoCrete |
Location: | Haiming, Germany |
Execution: | July 2021 |
Milling depth: | 30 cm |
Factors of success: | Immobilisation of PFC contaminated soil |
Location: | Metzingen, Germany |
Execution: | February/March 2021 |
Milling depth: | 25-50 cm |
Factors of success: | very high load-bearing capacity, savings in time and costs |
Location: | Deißlingen-Lauffen, Germany |
Execution: | September 2020 |
Milling depth: | 30 cm |
Factors of success: | vey high load-bearing capacity, savings in time and costs |
Location: | Balingen, Germany |
Execution: | May 2019 |
Milling depth: | 200 cm |
Factors of success: | Replacement of deep foundations, time and cost savings, slate rock could be consolidated frost-proof |
Location: | Eichenberg, Germany |
Execution: | November 2018 |
Milling depth: | 30 cm |
Factors of success: | Water contamination liability insurance license due to NovoCrete® |
Location: | Fellbach, Germany |
Execution: | May 2017 |
Milling depth: | 30–70 cm |
Factors of success: | Stabilization of silty clay
|
Location: | Eislingen, Germany |
Execution: | June 2016 |
Milling depth: | 40 cm |
Factors of success: | High savings of time and costs, no soil excavation
|
Location: | Herrenzimmern, Germany |
Execution: | October 2015 |
Milling depth: | 40 – 80 cm |
Factors of success: | Company was able to move into the new building before winter, maximum of time saving
|
Location: | Markgröningen, Germany |
Execution: | April 2012 |
Milling depth: | 50–80 cm |
Factors of success: | Very high load-bearing capacities, time and cost savings, conservation of resources
|
Location: | Stockach, Germany |
Execution: | November 2011 |
Milling depth: | 35 cm |
Factors of success: | No soil replacement necessary, saving of construction time and costs
|
Location: | Minden, Germany |
Execution: | November 2010 |
Milling depth: | 40 cm |
Factors of success: | Less transportation of soil and new materials to and from the site, high load-bearing capacity and frost resistance
|